Help with your seawall project·Pensacola
Navarre & Holley · Your waterfront project

Navarre & Holley Seawall Repair and Drainage

Plan seawall repairs in Navarre and Holley with soundside drainage, river access and Santa Rosa County permit checks. Compare a clear, site-specific scope.

Describe your project on this page ↓
Navarre waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.NavarreNavarre BeachEast BayNavarre waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.NavarreNavarre BeachEast Bay
Land: U.S. Census Bureau, 2026. Reference points: Census and local GIS; Navy Point: © OpenStreetMap contributors; Innerarity Point: Wikipedia/GNIS. General orientation only; not a survey, flood map or service boundary.

Get to know your waterfront

Navarre and Holley include soundside and river-access settings that need different descriptions in a repair request. County records place Navarre Park beside Santa Rosa Sound, East River Boat Ramp on Highway 87 in Holley and another ramp on Live Oak Street. State the actual waterway and frontage rather than asking for a generic Navarre wall price.

2019 RESTORE plan: Navarre Park water quality · East River Boat Ramp in Holley · Holley Boat Ramp

Follow the water from the road to the shoreline

Ask whether water is arriving over the ground, through a pipe or through a failed wall connection. A contractor should explain the suspected route and what evidence supports it before recommending a repair. Note whether the problem follows rain, high water or both. Photos from the same safe position are more useful than an isolated close-up with no location.

Navarre Park documents a local runoff problem

The county’s 2019 RESTORE plan describes runoff from US 98 passing through Navarre Park toward Santa Rosa Sound and proposes treatment to reduce debris, sediment and other contaminants. This is a historical planning record, not a current inspection of the park or your property. It does show why replacing a waterfront wall without discussing upland drainage can leave an important question unanswered. 2019 RESTORE plan: Navarre Park water quality 2019 RESTORE plan: Navarre Park water quality

For a soundside home, show the proposed drainage route and ask whether any public connection or easement is involved. For a river or bayou lot, identify the actual receiving water and relevant shoreline boundary. The county describes a separate protection zone for its named bays and bayous; do not apply a soundside assumption without checking the map and survey. Santa Rosa County coastal construction

Access needs more than a nearby ramp

  • East River Boat Ramp is listed at Highway 87 South in Holley.
  • Holley Boat Ramp is listed on Live Oak Street.
  • Neither listing grants permission for private construction staging.
  • Ask the contractor to identify the approved unloading point and route.

The water approach, upland gate width and room to store removed material should be discussed together. If equipment cannot use the assumed route, the cost and schedule may change. Make the access assumption visible in the proposal. East River Boat Ramp in Holley Holley Boat Ramp

Protect the habitat while solving the defect

Santa Rosa County’s planning record identifies seagrass habitat in the Sound and pressure from development and runoff. Ask whether the frontage needs a current habitat check and how access or sediment controls will be arranged. The regional record does not establish grass coverage at a specific wall. 2019 RESTORE plan: Navarre Park water quality

Use a condition assessment to establish whether the wall, soil or drainage needs work. If repair and replacement are both viable, compare the parts each proposal retains, the access required and the restoration included. The cost guide provides a scope checklist without claiming one local price fits every shoreline.

What could the work cost?

Ask for a quote that identifies drainage work, access permissions, material handling and shoreline construction separately. A soundside job and a river-access job with the same length may have different mobilization needs.

Published starting ranges, not quotes. Pensacola-area figures cover replacement and foam injection; other figures retain their Florida source area.

Compare quotes and plan a budget →

Find the relevant permits and records

Navarre & Holley researched starting points
Starting pointWhat to resolvePrepare and look up
Santa Rosa County Development Services
Coastal-construction zoning and building review.
Provide the parcel survey, mean-high-water information, structure layout and access plan.
County planning and environmental staff
Check shoreline protection, habitat and any existing public access.
Identify vegetation, waterbody and easements on the proposed work plan.
USACE Pensacola Permits Section
Check the federal route for the in-water portion.
Include wall, dock, pilings and any sediment movement in the same description.

Prepare the questions for the responsible office.

Build a useful project brief

Collect the local records and site details that affect the proposed work.

  1. Identify the receiving water

    Use a marked survey and aerial to name the Sound, bay or river frontage. Ask the reviewer which shoreline protection provisions apply.

    Santa Rosa County coastal construction

  2. Record the runoff route

    Show drains, low spots and any connection toward a road or shared system. Ask who can authorize changes.

    2019 RESTORE plan: Navarre Park water quality

  3. Confirm the mobilization assumption

    Get the unloading location and permitted use in writing before treating a public ramp as part of the construction plan.

    East River Boat Ramp in Holley · Holley Boat Ramp

Start with what you know

Discuss your Navarre & Holley waterfront

Start with the location, the concern and the records already available for the property.

Clear answers for your waterfront. A practical next step for your seawall.

Getting your form ready…

Navarre & Holley project questions

Can a seawall stop water entering from the street side?

A wall proposal should explain how upland runoff will drain after construction. The Navarre Park planning record documents why runoff toward the Sound is a local concern, but an assessor must establish the route and cause at your own property.

2019 RESTORE plan: Navarre Park water quality

Are Navarre and Navarre Beach the same permit situation?

Navarre Beach has a separate planning and leasehold framework, including specific coastal and canal considerations. Locate the parcel before selecting the checklist. Mainland waterway work still needs the applicable county and environmental review.

2040 comprehensive plan supporting documents · Santa Rosa County coastal construction

Keep planning

Nearby waterfront guides

Oriole Beach & Tiger Point, Navarre Beach, Garcon Point & East Bay

View the local guide directory.

Show sourcesHide sources
  1. 2019 RESTORE plan: Navarre Park water qualitySource reviewed 2026-10-27 · official indexed text
  2. East River Boat Ramp in HolleySource reviewed 2026-10-27 · official indexed text
  3. Holley Boat RampSource reviewed 2026-10-27 · official indexed text
  4. Santa Rosa County coastal constructionSource reviewed 2026-10-27 · official indexed text
  5. Santa Rosa County GoMapsSource reviewed 2026-10-27 · official indexed text
  6. Jacksonville District regulatory office locationsSource reviewed 2026-10-27 · official indexed text
  7. 2040 comprehensive plan supporting documentsSource reviewed 2026-10-27 · official indexed text